TILOS
is one of the most important software specialized in the planning and control of certain types of projects ( linear projects).
TILOS 
is used in the major international companies and is increasingly grow up.

TILOS
added a new dimension to dealing with ٍscheduled which is the location or distance dimension.
This course includes:
The basics of dealing with TILOS
Handle the axis of time and distance
Add tasks with all their data
Add resources, cost and prepare graphs
Update the project data and add the completion percentages
Comparison between baseline and actual progress
Goals of the course
This course is designed in a practical way where the trainee must apply each step by himself and make sure to check it before moving on to the next step. Also, a set of practical applications that the trainee is required to solve and apply himself as a practical training to ensure the acquisition of the necessary skills required to deal with the program
By the end of this course you will have the knowledge and skills to deal with the TILOS efficiently.  TILOS is a new to the trainees. Therefore, the explanation plan went quietly and step by step .
Who this course is for:
Planning Engineer
Consultant
Project Manager

What you'll learn

Planning and control linear project using TILOS

Requirements

  • You will need a copy of Adobe XD 2019 or above. A free trial can be downloaded from Adobe.
  • No previous design experience is needed.
  • No previous Adobe XD skills are needed.

Course Content

27 sections • 95 lectures
Expand All Sections
1-Introduction
3
1.1-Introduction
1.2-Download & Install TILOS
1.3-TILOS User interface
2-Project
3
2.1-Create a project
2.2-Adding project layout drawing to Project
2.3-Adding Station Points
3-Tasks
14
3.1-Adding Tasks
3.2-Task Snapping
3.3-Task Annotation
3.4-Task Style
3.5-Task calculations
3.6-Add relations between tasks
3.7-Calendars
3.8-Repetitive Tasks
3.9-Tasks Group
3.10-Milestones
3.11-Hammock Task
3.12-Summary Task
3.13-Vertical Tasks
3.14-Assignment - Adding Project
4-Working with views
7
4.1-Columns $ Rows settings
4.2-Cell settings
4.3-Adding New View
4.4-Adding sketches from symbol
4.5-Land and road elevation
4.6-Cut and Fill Histogram
4.7-Adding Company logo and revision box
5-Gantt Chart View
5
5.1-Gantt Chart Table Area
5.2-Dealing with tasks in table area
5.3-Tasks Grouping and filter
5.4-Gantt Chart Bars Area
5.5-Gantt Chart with Location
6-Resources and Cost
8
6.1-Resources and Cost - Introduction
6.2-Resources Library
6.3-Resource Allocation
6.4-Cost Allocation
6.5-Resources Histogram
6.6-Resource Table
6.7-Cost / Income Histogram
6.8-S-Curve
7-Project Control
5
7.1-Baseline
7.2-Progress Percentage -Simple
7.3-Progress Percentage - Task Steps
7.4-Progress Percentage -Advanced
7.5-Adding Actual Resources and Cost
8-Sub-Projects and Layers
2
8.1-Layers and Filter
8.2-Sub-Projects
9-Import Projects
2
9.1-Import projects from Primavera P6
9.2-Export Projects to Primavera P6
10-Project tools
2
10.1-Global Change
10.2-Task Speed