image
The Ultimate Drawing Course Beginner to Advanced...
$179
$79
image
User Experience Design Essentials - Adobe XD UI UX...
$179
$79
Total:
$659

Description

Oracle Primavera Risk Analysis is a powerful tool enable us to model risk and analyze its impact on the project objectives such as schedule and cost.


In addition, Primavera Risk Analysis Provides an easy integration with a wide range of scheduling tools and risk register solution and offers easy techniques for determining contingency and risk response plans and for reporting confidence levels for project success.




Through this course, you’ll learn how to use Primavera Risk analysis to Analyze, Mitigate, and Manage Risks during project lifecycle.




Build a Powerful Skills of using Primavera Risk Analysis:


Integrate with other Schedule software such as Primavera P6 & MS Projec
t
Templated Quick Risk.
Risk Analysis
Risk Register
Distribution Graph
Tornado Diagram 
Distribution Analyzer 
Flexible Reporting
Course Objectives


This course is designed in a practical practice and going step by step to ensure that before you go to next step you  have trained will and work by your hand in a practical example.
Also I have tried to simplify the explanation and support the lessons with assignment to allow you to get more practice
By completing this course you will have the knowledge and skills  of using Primavera Risk Analysis to, analyze , mitigate and control risks in a professional manner .
Who this course is for:
Project Manager
Consultant
Planning Engineer
Contract Manager

What you'll learn

Create plans and risk models in Primavera Risk Analysis

Modeling task durations and entering uncertainty

Running the risk analysis

UndeArstanding Monte Carlo Simulation

Adding uncertainty to cost

Risk register

Qualitative risk analysis

Quantitative risk analysis

Risk response and mitigation scenarios

Reports

Requirements

  • You will need a copy of Adobe XD 2019 or above. A free trial can be downloaded from Adobe.
  • No previous design experience is needed.
  • No previous Adobe XD skills are needed.

Course Content

27 sections • 95 lectures
Expand All Sections
1-Introduction
3
1.1-Introduction
1.2-Download and install Primavera Risk Analysis
1.3-User Interface
2-Create a Plan
13
2.1-Adding a new plan
2.2-Create a new plan
2.3-Adding tasks details
2.4-Add tasks details
2.5-Calendars
2.6-Calendar
2.7-Resources
2.8-Team Resource
2.9-Adding resources
2.10-Adding Resources
2.11-Resource Leveling
2.12-Resource Leveling
2.13-Updating Progress
3-Projects Import & Export
4
3.1-Import MS Projects
3.2-Import Primavera P6 Projects
3.3-Import Check
3.4-Schedule Check
4-Risk Analysis
10
4.1-Run Risk Analysis
4.2-Duration Quick Risk
4.3-Risk Percentiles
4.4-Resources and cost risk Analysis
4.5-Probabilistic Branches
4.6-Task Existence Probability
4.7-Templated Quick Risk
4.8-Corelation
4.9-Calculation of Correlation
4.10-Sensitivity Analysis
5-Qualitative Risk Analysis
3
5.1-Risk Breakdown Structure
5.2-Risk Register
5.3-Risk Mitigation Plan
6-Quantitative Risk Analysis
3
6.1-Qualitative Risk Analysis
6.2-Build Impacted Risk Plan
6.3-Probabilistic Cash Flow